My Personal Experience in Civil Construction

I am sharing my personal experience with you, which I have gained by working in civil construction sites for more than 10+ years. It will help you to solve the day today issues you are facing when you are handling a Civil Construction Site.

Lakshitha Perera

BSc(Hons) In Civil and Environmmental Engineering

I am an experienced Engineer, who is having 10+ years of experience in the field. I have worked as a contractor, as a consultant and as well as an engineer who is responsible for the whole civil work that is going in the site.

I am willing to share my experience in this site to keep you in loop to get my knowledge which I have learned by experiencing the hard times.

Featured Projects

Greater Balangoda WaterSupply Project

GBWSP

I have started my Career from this project, and it gave me great deal of challenges when I am starting as a Presious Engineer to the field. I have faced so many challenges in this project and I am willing to share the challenges I have aced for the learning of the precious Engineers.

Greater Dambulla Water Supply Project

GDWSP

I have transferred from My previous project to this project with MAGA Engineering. I was the only engineer working in this project and I had 3 Engineering Assistants and several foremen under my command to complete the project scope. As I had only 8 months experience in a project I have faced lots of difficulties and issues. I am discussing all those in this chapter for your knowledge.

Greater Kandy NRW Project

GKWSP

After my second appointment from MAGA I have resigned from the company and I have joined with Squire Mech Engineering in this project. The only task and responsibility on me was to install 10 numbers of flow meter chambers in the existing water mains in the Harispaththuwa area (Kandy) with GSM reading points. This was a new challenge for me and I will share all the things in detail for your reference.

Balangoda WSP Rehabilitation

BWSP

After successfully completing the GKWSP NRW project, I have transferred again to BWSP by SME. The task was to remove the existing AC line which was supplying the raw water to BWSP stage one and provide a 400mm Diameter PE line in from the raw water intake to the water treatment plant.
In this project I have gained a different experience and I am willing to discuss all the things in this chapter for your knowledge.

Greater Dambulla Water Supply Project

GDWSP

After successfully completion of my responsibilities in the previous project, again I have requested to join to this project by the main contractor WABAG Engineering. I have received this opportunity due to the skills I have shown in this project while working with MAGA Engineering. This was the first time I was working as the main contractor Civil works representative of a project; I will share all the issues I have faced and the solutions I have provided for them in this chapter.

Kelani Right Bank Water Supply project Stage II

KRBWSP II

After successfully completion of my previous project I have taken a position of a construction Manage in MAGA engineering in the above project. This was my first tim appointment as a Manager in charge and MAGA handed over a Zone of construction under me with 3 Engineers and 4 EA's in my command. I will explain thoroughly the problems I have experienced in this project and how I have faced them in this Chapter.

Girandurukotte Water Supply Project

GWSP

After successfully completion of my responsibilities in the previous project, I have resigned from MAGA Engineering, and I have joined to Squire Mech Engineering as assistant Resident Manger (ARE) of the above project. In this case there were different kind of responsibilities bested upon me. In this chapter I am going to explain regarding these responsibilities and how I have successfully faced them.

Alawwa, Pothuhera and Polgahawela WSP

PPAWSP

After successfully completion of my responsibilities in the previous project, I have resigned from GTC and joined to this project to work under the main contractor of this project, WABAG Intenational. I have got this opportunity to join this project due to the skills I have shown during the last project with WABAG Engineering. I was destined to work in WTP, Intake, Reservoirs and administration buildings in this project and I have faced so many issues which I like to share with you in this Chapter.

Jaffna Kilinochchi water supply and Sanitation Project

JKWSSP

After successfully completion of my responsibilities in the previous project, I have resigned from WABAG Engineering, and I have joined in this project as the Treatment Plant Civil Manager of SUEZ International.
SUEZ international was the main contractor of the KRBWSP ad they have recruited me directly for this position due to the talents I have shown during my last project with them.
This is a challenging project for me as I am still struggling to complete my scope of work and handover to M and E works.
I am willing to tell my tale of struggles I have passed during this project for you.

I can Give You Consultancy

What Is Your Construction Issue?

Please contact me for all kind of construction related issues. I can give you solutions for all the difficulties you face during the construction process. Best solution for your issue within your budget range.

First-class Professional

Practical Services

We can provide the best and feasible solution for all your construction difficulties. With our 10+ years of experience working in sites, we have faced so many difficulties and we have taken most feasible solutions to overcome them. Without proposing trial and error methods, we can provide the best and feasible solutions for your problems.

If you want to remodel your existing structures, please contact us for the best ideas as per your requirement and for the safety of the existing structure.

Constructing a new structure is easy but remodeling is difficult because we have to ensure that the existing structural stability is maintained. But, we have solutions for all your needs.

Due to several reasons the structures can be failed to retain its structural integrity. All these failures can overcome by simple solutions and treatments. By this we can increase the life span of the structures and strength of the elements.

We can provide more feasible solutions for this kind of requirements within your budget range.

First-class Professional

Document Services

We can prepare all kinds of Method Statements as per your request. Already we have prepared 300+ customized method statements as per our client requirements.

We will give you unlimited revisions until it is getting approved from your client.

Comment sheet replies related to the MS can be prepared for approval.

Presentations can be made attractively with pictures and animations. A guide can be given about how to present if required.

Tables and bar charts can be prepared and included in the presentations.

As per your requirements we can submit the presentations within 24 hours.

Professional Bar Schedules can be prepared with high amount of accuracy level.

Cutting Shedules will be provided by minimizing the off cuts and wastage generation.

Bar numbering will be done if you can provide the Autocad copy of the drawings. unlimited revisions as per your requirements.